Home
About LOCO
Company Profile
Honors and Qualifications
Talent recruitment
Products
Intelligent Enhanced Gas/Oil Recovery System
Surface Instruments and Meters
Dynamic Monitoring Instruments
Special Instruments and Tools
Logging and Exploration Instruments
Oilfield services
Technology
Blog
LOCO News
Industry News
Investor
Contact Us
Product
● Intelligent Enhanced Gas/Oil Recovery System
● Smart Layered Injection Series
● Smart Layered Production Series
● Surface Instruments and Meters
● Dynamic Monitoring Instruments
● Special Instruments and Tools
● Logging and Exploration Instruments
● Open Hole Logging Tools
Electronic Scale Remover
Designed to address pervasive inorganic scale deposits (e.g., CaCO₃, CaSO₄, BaSO₄) in oilfield water injection wells, this equipment effectively eliminates issues such as scaling on tubing walls, blockages, abnormal injection pressure surges, and increased well-flushing frequency.
+
More
Electric Packer
It can realize electric setting and unsetting through surface control, and is mainly used for segmented water finding and plugging in horizontal wells, as well as layered testing in oil wells. It can complete multi-layer parameter testing with one trip of tools into the well, solving the problem of efficient layered testing in highly deviated wells and horizontal wells.
Electric Release Tool
It is used to anchor and hang on the inner wall of oil pipes or casing wellbore during long-term testing in oil pipes or casing wells, with testing instruments hung below. It can be detached from logging wires and operation vehicles during long-term downhole testing, saving manpower and material resources.
Electric Bridge Plug Setting Tool
It is applied to special downhole operations such as staged fracturing, emergency well plugging, and old well readjustment. It has the function of real-time monitoring and control of downhole multiple parameters, solving the pain points of blind operation and data missing in traditional bridge plug setting.
Electric Ash Injection Tool
It is used in oilfield bottom layer sealing technology. The instrument is run into the well via a cable. When it reaches the predetermined position, the instrument is powered on, and the motor is controlled to drive and open the cover plate, realizing the ash injection function.
High-Pressure Physical Property Sampler
It is used for sampling various downhole fluids in oilfields. It adopts an electronic clock for timing. When the instrument reaches the target formation, the controller activates the control mechanism to close the sampling cylinder. After the instrument is lifted to the ground, the sample is transferred and stored, and finally transported to the laboratory for analysis.